Overview
In 2013, the Infrastructure Carbon Review identified that the infrastructure sector is responsible for over 50% of the UK’s carbon emissions, based on a 2010 dataset that identified contributions by sector and the emissions under the control and influence of different parts of the sector. In addition, this review found that, due to anticipated decarbonisation in other sectors, infrastructure was likely to account for 90% of the UK’s carbon emissions by 2050. Very large reductions in infrastructure’s carbon emissions are therefore critical to meet the UK’s 2050 carbon reduction targets, and progress needs to be kept under constant review.
ICE’s Carbon Project (formerly the Net Zero Task Force) is focused on enabling civil engineers to understand and act effectively to reduce carbon emissions throughout the sector and influencing wider industry. One critical question is the extent to which progress has been made since the Infrastructure Carbon Review, especially since this review was based on 2010 data. The UK’s hosting of the CoP26 climate talks in Glasgow in November 2021 heightens the need for progress and recent data.
Therefore, one current ICE research project, led by Dr Jannik Giesekam, is to update the emissions dataset behind the original Infrastructure Carbon Review with data from 2010 to 2018. Updating the dataset will provide an assessment of progress to date and highlight the remaining challenges in delivering Net Zero.
In this lecture, Tim Chapman (Arup) will discuss how a whole systems approach helps to understand not only the significance of the updated emissions data but also how to use it most effectively. Next, Dr Giesekam (Leeds University) will describe the research and the updated emissions data from 2010-18. Finally, Maria Manidaki (Mott MacDonald) will provide a practitioner’s perspective on the significance of the emissions update and how the whole sector can respond.
More like this
- Type
- Webinar
Killaloe Bypass: Shannon Bridge crossing
The construction of the Shannon Bridge crossing as part of the Killaloe Bypass; the construction of a new 6 span steel bridge across the River Shannon and the challenges faced by the site team.
- Type
- Webinar
Delivery of the Belfast Tidal Flood Alleviation Scheme
Join us to hear from the client, the Department for Infrastructure, the client’s representative, AtkinsRéalis, and D&B contractor, Charles Brand, as they describe the design and construction of the flood defence scheme protecting Belfast from tidal flooding to 2080.
- Type
- Webinar
Careers talks
Aimed at students, this series of seven webinars which runs until May 2025 will enable you to learn about professional life from recent graduates from across the industry.