Los Angeles Metro is constructing a light rail corridor beneath Downtown Los Angeles - The Regional Connector Transit Corridor (RCTC). To provide operational flexibility, RCTC required a track crossover adjacent to one of the stations. Right of way constraints required the crossover be constructed at relatively shallow depth using Sequential Excavation Methods (SEM), resulting in what is believed to be the largest mined cross section in Los Angeles.
Challenges faced for the SEM cavern design and construction included strict limits for tunnelling induced displacements in surrounding structures and high seismic design loads with 2,500 year return periods. This presentation describes the design approach of the SEM cavern, with an emphasis on the seismic analysis, as well as the actual conditions faced during construction.
Mott MacDonald
Join us to hear from the client, the Department for Infrastructure, the client’s representative, AtkinsRéalis, and D&B contractor, Charles Brand, as they describe the design and construction of the flood defence scheme protecting Belfast from tidal flooding to 2080.
Aimed at students, this series of seven webinars which runs until May 2025 will enable you to learn about professional life from recent graduates from across the industry.
This is your chance to influence how Transport for the North (TfN) bring their Strategic Transport Plan to life across the North. Input your views, engage with others, and hear from TfN’s interim strategy director.