- Date
- 10 August 2021
- Time
This event has now ended
Overview
The first nearshore wind farm (99MW) developed in Vietnam was commissioned in 2016 in the Mekong Delta, with the turbines connected to shore by piled walkways. Since that time a number of other nearshore projects have commenced construction in the area.
A common feature of all these projects is the deep soft marine deposits that necessitate long piles, and the difficult inter-tidal conditions that increases the time for and cost of construction. This presentation examines the design concepts being used at these projects and draws on learnings that Mainstream Renewable Power has made in developing the 1400MW offshore wind farm in Soc Trang that is in preparation for a construction start in Q4 2021.
More like this
- Type
- Webinar
Killaloe Bypass: Shannon Bridge crossing
The construction of the Shannon Bridge crossing as part of the Killaloe Bypass; the construction of a new 6 span steel bridge across the River Shannon and the challenges faced by the site team.
- Type
- Webinar
Delivery of the Belfast Tidal Flood Alleviation Scheme
Join us to hear from the client, the Department for Infrastructure, the client’s representative, AtkinsRéalis, and D&B contractor, Charles Brand, as they describe the design and construction of the flood defence scheme protecting Belfast from tidal flooding to 2080.
- Type
- Webinar
Careers talks
Aimed at students, this series of seven webinars which runs until May 2025 will enable you to learn about professional life from recent graduates from across the industry.