- Date
- 21 April 2021
- Time
This event has now ended
Overview
ICE Wales Cymru Ground Engineering Group has organised this webinar on the seismic hazard assessment, commissioned by Horizon Nuclear Power, for the Wylfa Newydd site.
The project assessed the potential for capable faulting at the site, defined the seismic criteria directly from a probabilistic seismic hazard assessment (PSHA) and assessed the impact of potential tsunami inundation.
The presentation will highlight new developments, the collaboration with numerous parties and explain how this has helped to influence the nuclear industry in the UK.
More like this
![Killaloe Bypass: Shannon Bridge crossing](/media/qcfble2o/kilaloe-bypass-lead-2.jpg?width=800&height=566&format=WebP&quality=100&v=1db627dfbb8fc00)
- Type
- Webinar
Killaloe Bypass: Shannon Bridge crossing
The construction of the Shannon Bridge crossing as part of the Killaloe Bypass; the construction of a new 6 span steel bridge across the River Shannon and the challenges faced by the site team.
![Delivery of the Belfast Tidal Flood Alleviation Scheme](/media/dushjg32/belfast-tidal-flood-lead.png?width=800&height=566&format=WebP&quality=100&v=1db5204ef021700)
- Type
- Webinar
Delivery of the Belfast Tidal Flood Alleviation Scheme
Join us to hear from the client, the Department for Infrastructure, the client’s representative, AtkinsRéalis, and D&B contractor, Charles Brand, as they describe the design and construction of the flood defence scheme protecting Belfast from tidal flooding to 2080.
![Careers talks](/media/v4xg4wyn/career-talks.jpg?width=800&height=566&format=WebP&quality=100&v=1d8db0883885180)
- Type
- Webinar
Careers talks
Aimed at students, this series of seven webinars which runs until May 2025 will enable you to learn about professional life from recent graduates from across the industry.