Overview
The aim of this study was to generate at least one practical alternative to the use of conventional heavy lift vessels for the removal of offshore platform topsides. Atkins followed its in-house procedure for “appraise and select” concept engineering. This process is formed of three main phases; Divergence, Emergence & Convergence. Once identified, the chosen concept was taken through a formal concept design process.
This was a joint study between Atkins, Shell and ALE Heavy Lift. Engineering was focussed on the perceived higher risk phases of the operation, namely, the stability of the jacking system during the lift and float-off. The presentation will step through the process that Atkins, Shell and ALE Heavy Lift followed. It will detail the concept operation and the engineering analysis performed in assessing its feasibility.
More like this
- Type
- Webinar
Delivery of the Belfast Tidal Flood Alleviation Scheme
Join us to hear from the client, the Department for Infrastructure, the client’s representative, AtkinsRéalis, and D&B contractor, Charles Brand, as they describe the design and construction of the flood defence scheme protecting Belfast from tidal flooding to 2080.
- Type
- Webinar
Careers talks
Aimed at students, this series of seven webinars which runs until May 2025 will enable you to learn about professional life from recent graduates from across the industry.
- Type
- Webinar
Implementation of TfN's northern transport strategy
This is your chance to influence how Transport for the North (TfN) bring their Strategic Transport Plan to life across the North. Input your views, engage with others, and hear from TfN’s interim strategy director.