- Date
- 11 November 2021
- Time
This event has now ended
Overview
The FLOW footbridge is a result of a fresh approach to collaborative working. The project focused on doing things differently to create a highly motivated and empowered team to do what they are best at.
This is a Network Rail Research and Development portfolio funded project to develop a low cost lightweight solution to close railway foot crossings. The prototype bridge offers a lower cost solution by utilising a high strength, low weight material and modular design, drastically reducing construction time and cost. It also incorporates a structural health monitoring system that will help improve the design and change Network Rail manages the asset.
The focus of the design has been to create a bridge that enhances communities and the use of new materials that can reduce the impact to the environment. This project has demonstrated what is possible with the talent in the UK. The challenge is how we make the most of it.
This event is co-badged with the Institution of Structural Engineers (IStructE).

More like this

- Type
- Webinar
ICE North ECN Workshop – Attribute 3: commercial ability
A series of web-based workshops aimed at graduate, student and technician members who are working toward EngTech, IEng or CEng with the ICE. These workshops provide advice and guidance on recording Initial Professional Development (IPD), broken down by attribute.

- Type
- Webinar
Technician Teabreak: becoming a reviewer
This is an opportunity for Technician members (EngTech MICE/FICE) and those wishing to become qualified at EngTech grade to come together to discuss issues that are important to technicians. This session explores becoming an ICE EngTech reviewer, with benefits and applying.

- Type
- Webinar
Active travel design: technical webinar
Join the ECNet for this technical webinar about the design of active travel infrastructure. Two Incorporated Engineers from Mott MacDonald will share key learning from a redevelopment scheme focusing on active travel, and a new layout for the design of CYCLOPS junctions.