Overview
Joint presentation on the technical design and construction methodologies for the remedial works to replace the footway panels on the Menai Suspension Bridge.
Following a Principal Inspection of the Menai Suspension Bridge in 2020, the cantilevered footway panels were categorised as a high category defect with spalling at the soffit of most of the panels.
This presentation will discuss the optioneering phase with WSP as the Principal Designers for the scheme, the involvement of Spencers through an informal ECI arrangement and Principal Contractor during the construction phase and progress of the works on site.
This is a joint presentation of WSP, The Spencer Group and UK Highways A55 team about the technical design and construction methodologies for the remedial works to replace the footway panels.
More like this

- Type
- Webinar
Road safety in Uganda: status, challenges, and audit practices
Uganda records among the highest road fatality rates in Sub-Saharan Africa. The presentation will examine the current road safety landscape, audit methodologies, and practical interventions for safer roads.

- Type
- Networking
A very Scilly problem: using biomimicry to inform climate resilient infrastructure
Whilst engineers struggle to adapt infrastructure for a changing climate, nature is already surviving and thriving in these conditions. Using a biomimicry approach, this presentation explores how organisms on the Isles of Scilly could inform climate resilience in the UK.

- Type
- Webinar
Climate change and urban flooding: why we fail to manage water in the built environment
Explore the growing challenges of water management, including urban flooding, declining public trust and climate pressures. Learn about the barriers to implementation and discover why we need more industry-wide reflection on effective, scalable solutions.