- Date
- 13 October 2026
- Time
- 12:00 - 18:30 MYT (GMT+8)
- Location
-
Eastern Pretech Malaysia Lot 2, Jalan Perusahaan 5 Kawasan Perindustrian Beranang Semenyih Selangor, 43700 Malaysia
This event has now ended
Overview
This factory visit offers a valuable opportunity to explore the complete manufacturing process of precast concrete components at Eastern Pretech, one of Malaysia's leading precast concrete manufacturers. As Industrialised Building System (IBS) adoption continues to grow, precast construction plays a significant role in improving construction quality, productivity, safety, and project delivery across the industry.
Participants will gain first-hand exposure to the production of various precast elements, including hollowcore slabs, double-tee slabs, beams, columns, wall panels, staircases, and other structural components.The visit will cover the entire production cycle, from mould preparation, reinforcement and prestressing works, concrete casting, curing, demoulding, finishing, quality inspection, storage, and delivery to project sites.
In addition, attendees will learn how quality assurance and quality control (QA/QC) systems are implemented throughout the manufacturing process to ensure compliance with project specifications and relevant British Standards (BS) and Eurocodes. The visit will also demonstrate how modern precast manufacturing techniques improve construction efficiency, minimise material wastage, enhance workplace safety, and support sustainable construction practices.
Through this technical visit, participants will develop a better understanding of the integration between structural design, engineering production, and construction execution, while appreciating the important role of precast technology in delivering high-quality, durable, and cost-effective infrastructure and building projects.
Important Notice
Participants are kindly reminded to bring their own Personal Protective Equipment (PPE), as PPE will not be provided during the factory visit. Required PPE includes Covered safety shoes, a Safety helmet, and a Safety vest.
Transportation
Bus transportation will be provided for participants departing from Wisma IEM. Participants who do not take the bus from Wisma IEM must arrange their own transportation to the factory.
Programme
Assemble at Wisma IEM
Depart from Wisma IEM
Arrive at Eastern Pretech
Factory visit
Q&A session
Depart from Eastern Pretech
End of visit
Sustainable Development Goals:
More like this

- Type
- Webinar
5-week course: finance
A useful five session course delivered by industry experts focussing on key aspects of finance in Civil Engineering.


- Type
- Webinar
The Wrexham Gateway regeneration project
The Wrexham Gateway is a £100m+ GDV regeneration project, centred around transport and connectivity improvements, and designed for the benefit of residents and visitors to North Wales. Alistair Aldridge, the project manager responsible, will talk through the design aspiration and challenges to deliv…