- Date
- 27 April 2021
- Time
This event has now ended
Overview
This talk will focus on the design and construction challenges faced in constructing the restoration of a canal through one of the largest roundabouts in Gloucestershire.
The scheme required the collaborative efforts of several partner organisations to make delivery of the project a reality. It will also touch upon the impact of Covid-19 and some of the measures taken to keep the site team and members of public safe.
The panellists are:
- Mladen Dragojlovic, Atkins – Key stats, scheme background, site history, site information, pre-construction investigations, design considerations and options. Mladen will present initial pre-works photos, design drawings
- Graham Ellingford, Atkins – Programming and contracts
- Wesley Tudge, Alun Griffiths – Construction and effects of Covid-19
- Gareth Cook, Alun Griffiths and High Compliance – Health and Safety, innovations and capturing progress
- All - Lessons learned
More like this

- Type
- Webinar
5-week course: sustainability
This course is designed to give developing professionals a strong foundation in sustainable engineering, equipping them with the knowledge and practical skills to effectively integrate sustainability into their work.

- Type
- Webinar
The Haverfordwest Signature Footbridge and Western Quayside regeneration project
A presentation from the architect, structural designers, fabricators and the principal contractor that delivered this unique structure. The discussion details how the bridge developed from concept design through to installation including the use of one of the largest cranes in the UK for the bridge …

- Type
- Webinar
Technician timeout: the role of a structural technician
This is an opportunity for Technician members (EngTech MICE/FICE) and those wishing to become qualified at EngTech grade to come together to discuss issues that are important to technicians.