Phil Evans
Laing O'Rourke
project engineer
A giant on the Liverpool waterfront, the new Everton stadium on Bramley-Moore Dock stands proud against the River Mersey.
Organised by ICE Merseyside, this presentation will be detailing the new stadium’s reinforced concrete frame and bowl, with a focus on modern methods of construction, the structural steel frame by subcontractor Severfield, and the impressive external works.
The speakers will give insight into the construction of a major project in the UK and how Laing O'Rourke have delivered the project, utilising innovative solutions to combat difficult weather conditions.
As a precursor to this event, it is encouraged to watch back the John Sargent Lecture: Dock filling for the new Everton stadium project at Bramley-Moore Dock, for an insight into how the existing dock was prepared.

This course is designed to give developing professionals a strong foundation in sustainable engineering, equipping them with the knowledge and practical skills to effectively integrate sustainability into their work.

A presentation from the architect, structural designers, fabricators and the principal contractor that delivered this unique structure. The discussion details how the bridge developed from concept design through to installation including the use of one of the largest cranes in the UK for the bridge …

This is an opportunity for Technician members (EngTech MICE/FICE) and those wishing to become qualified at EngTech grade to come together to discuss issues that are important to technicians.