Overview
The main cooling water supply for the Hinkley Point C nuclear power station will be fed from four intake head’s which will be located on the seabed of the Bristol Channel. The water will travel along long 2 separate segmentally lined tunnels into the power plant completing its loop by returning to sea via a third tunnel. Onshore, the tunnelling construction works include 3 shafts, 8 primary lined tunnels and a number of complex secondary lined structures.
In this lecture, Pat & Matt will discuss the many engineering challenges faced in the construction of these works and how the team overcame unique logistical challenges, difficult ground conditions and challenging weather to build the Head’s and the tunnels to nuclear standards throughout the global pandemic.
More like this

- Type
- Webinar
Applying military GIS principles to construction
This webinar will give an overview of the use of GIS in a military context and how its principles and approaches can enhance design, collaboration, decision-making and delivery in construction projects.

- Type
- Webinar
Viktor AI: The future of engineering delivery

- Type
- Webinar
Ground investigations, worth the risk?
This is a fantastic opportunity for you gain insight into a major client approach to risk and the value of undertaking site investigation.