Aarsleff
Aarsleff Ground Engineering is a leading ground engineering specialist, focusing on multi-discipline excellence and value engineering.
The performance requirements for HS2 embankments necessitate a stiff fill material with a minimum shear wave velocity of 160m/s durable to environmental conditions for a 120 year design life. However much of the natural ground along the HS2 route yields cohesive fills which soften on wetting and can’t meet this requirement.
As a sustainable alternative to importing over 10 million m3 of quarried granular fill for phase 1 of the project alone, lime stabilisation is being used to improve the site won material to the required stiffness.
This talk showcases highlights from an innovative programme of HS2 funded research and development delivered with collaboration between industry and academia which justified a 40% reduction to lime dosage. The programme delivered increased understanding of sulphate swell risks and enabled cold weather working.
Aarsleff Ground Engineering is a leading ground engineering specialist, focusing on multi-discipline excellence and value engineering.
Nottingham Trent University
Associate professor in geotechnics
Paul is a chartered civil engineer with 27 years’ experience in the construction industry. He is currently associate professor in Geotechnical Engineering at Nottingham Trent University, where he undertakes substantial consultancy and research in ground improvement, including a focus on soil stabilisation.
Balfour Beatty Vinci
graduate materials engineer
Seb is a graduate materials engineer at Balfour Beatty Vinci having spent 2 years post-graduation on the HS2 scheme, with a focus on site earthworks and soil stabilisation trials for the N1 / N2 sublots.

This course is designed to give developing professionals a strong foundation in sustainable engineering, equipping them with the knowledge and practical skills to effectively integrate sustainability into their work.

A presentation from the architect, structural designers, fabricators and the principal contractor that delivered this unique structure. The discussion details how the bridge developed from concept design through to installation including the use of one of the largest cranes in the UK for the bridge …

This is an opportunity for Technician members (EngTech MICE/FICE) and those wishing to become qualified at EngTech grade to come together to discuss issues that are important to technicians.