Angus Holdsworth
Andun
Managing Director
Event organised by ICE
Andun have extensive experience in specialist temporary works design and demolition engineering spanning over 25 years.
This includes:
1) Design of temporary works
2) Complex demolition
3) Specialist lifting.
The webinar will include the consultancy approach to various types of demolition works and good practice associated with these, construction and operations as outlined below:
A summary of local project case studies will also be covered including Regent Street Flyover, Leeds which included the complex demolition of two adjacent flyover’s under a phasing regime.
Andun
Managing Director
Aimed at students, this series of seven webinars which runs until May 2025 will enable you to learn about professional life from recent graduates from across the industry.
Join us for the ICE’s 16th Alternative Dispute Resolution workshop to discover the intricacies of adjudication in the UK. This year’s workshop will look at the role of technology and digitalisation in modern construction disputes.
The presentation describes the successful integration of existing, temporary, and permanent works in the renewal of the metallic hog-back spans of the Grade II* listed Barmouth Viaduct.