- Date
- 30 October 2024
- Time
This event has now ended
Overview
The event will commence with the Edinburgh Area Branch’s annual general meeting which will include a review of the branch’s activities over the previous 12 months by the chair, treasurer, secretary and ECNet committee chair. This will also include the nomination and election of the committee office bearers for the next 12 months.
There will then be a presentation providing an update on the ongoing refurbishment works to the Grade A-listed North Bridge in Edinburgh city centre. The North Bridge is situated in a UNESCO World Heritage Site, carries the A7 over Waverley Station and is a vital transport link connecting the Old and New Towns of Edinburgh.
The North Bridge was constructed over the period 1894-97 by Sir William Arrol & Co. who were also the contractor responsible for the construction of the Forth Rail Bridge.
Sustainable Development Goals:
More like this

- Type
- Webinar
ICE North ECN Workshop – Attribute 3: commercial ability
A series of web-based workshops aimed at graduate, student and technician members who are working toward EngTech, IEng or CEng with the ICE. These workshops provide advice and guidance on recording Initial Professional Development (IPD), broken down by attribute.

- Type
- Webinar
Technician Teabreak: becoming a reviewer
This is an opportunity for Technician members (EngTech MICE/FICE) and those wishing to become qualified at EngTech grade to come together to discuss issues that are important to technicians. This session explores becoming an ICE EngTech reviewer, with benefits and applying.

- Type
- Webinar
Active travel design: technical webinar
Join the ECNet for this technical webinar about the design of active travel infrastructure. Two Incorporated Engineers from Mott MacDonald will share key learning from a redevelopment scheme focusing on active travel, and a new layout for the design of CYCLOPS junctions.