- Date
- 09 September 2021
- Time
This event has now ended
Overview
Waterproofing gaskets for segmentally lined tunnels form a critical element within the tunnelling system. Poor design or selection choices can cause problems not only for the environment, the tunnel internal fixtures and fittings, and levels of comfort during construction and operation, but to the durability of the lining itself, operational safety, and even instability of the lining through the gradual loss of essential ground support. However, with just a little care they offer a cheap solution to a range of potential issues.
Mike’s presentation will consider aspects of material choice and material characteristics for the gasket as well as design and testing approaches and influencing factors for both well-established and new profiles.
Note: Lecture and the Q&A will be broadcasted live on YouTube
In case of any query please contact; The Secretary, BTS Tel: 020 7665 2229
or e-mail: [email protected]
or visit: http://www.britishtunnelling.org.uk
visit http://www.britishtunnelling.com
BTSYM on Facebook
BTSYM on Twitter
BTSYM on LinkedIn
BTS YouTube Channel
To join the BTS Young Members Mailing List please email to
[email protected]
More like this

- Type
- Webinar
Applying military GIS principles to construction
This webinar will give an overview of the use of GIS in a military context and how its principles and approaches can enhance design, collaboration, decision-making and delivery in construction projects.

- Type
- Webinar
Viktor AI: The future of engineering delivery

- Type
- Webinar
Ground investigations, worth the risk?
This is a fantastic opportunity for you gain insight into a major client approach to risk and the value of undertaking site investigation.