Overview
The completion of the Tilbury 2 Design & Build Project marked a significant milestone in the expansion of the Port of Tilbury, London. Located on the north bank of the river Thames, this £106M project was categorised as a ‘Nationally Significant Infrastructure Project’ under the Planning Act 2008 due to the quantity of goods that can be exported/imported from the Port. The new development comprises;
- A Roll-on/Roll-off (RO/RO) terminal for the import and export of containers and trailers, and
- A Construction Materials and Aggregates Terminal (‘CMAT’) for the handling and processing of bulk construction materials.
The facility was designed to accommodate vessels with a capacity of over 96,000 deadweight tonnage (carrying capacity) and length up to 250m. The Marine Works included;
- 57.5m long linkspan with associated piled bankseat structure,
- 55m x 45m floating pontoon with associated 2.4m diameter steel tubular restraint piles,
- Dredge pocket sheet pile cut-off wall to facilitate a 77,000m3 capital dredge and,
- 15No. berthing and mooring dolphins, including a 30m long articulated walkway
Doran Consulting was appointed by Principal Contractor GRAHAM as the Lead Designer for the permanent and temporary Marine Works.
The facility is operated by Forth Ports in partnership with P&O and currently services the Tilbury-Zeebrugge freight route bringing vital supplies to the UK.
More like this

- Type
- Webinar
5-week course: sustainability
This course is designed to give developing professionals a strong foundation in sustainable engineering, equipping them with the knowledge and practical skills to effectively integrate sustainability into their work.

- Type
- Webinar
The Haverfordwest Signature Footbridge and Western Quayside regeneration project
A presentation from the architect, structural designers, fabricators and the principal contractor that delivered this unique structure. The discussion details how the bridge developed from concept design through to installation including the use of one of the largest cranes in the UK for the bridge …

- Type
- Webinar
Technician timeout: the role of a structural technician
This is an opportunity for Technician members (EngTech MICE/FICE) and those wishing to become qualified at EngTech grade to come together to discuss issues that are important to technicians.