Alan Willoner
Mott MacDonald
technical director
Join Alan Willoner and Lorenzo Allievi as they share insights into the Leeds Flood Alleviation Scheme.
This is one of the largest, most complex, and innovative flood defence schemes ever designed and constructed in the UK and was delivered by the D&B contractor Bam Mott MacDonald JV.
The scheme is 19km in length. It has a CAPEX value of approximately £200M and a wide range of geotechnical challenges and solutions including approximately 10,000 piles and 1,000 anchors constructed with constrained access.
The presentation aims to share the highlights, and the lessons learnt, on topics including restricted access piling, constructability, interface with third party assets, seepage analysis, earthworks, value engineering, health & safety and sustainability.
Mott MacDonald
technical principal
Lorenzo Allievi is a technical principal at Mott MacDonald Sheffield. He has 18 years of geotechnical design experience gained from his work across Europe, USA and UK, contributing to a diverse range of infrastructure, building and civil projects.

This course is designed to give developing professionals a strong foundation in sustainable engineering, equipping them with the knowledge and practical skills to effectively integrate sustainability into their work.

A presentation from the architect, structural designers, fabricators and the principal contractor that delivered this unique structure. The discussion details how the bridge developed from concept design through to installation including the use of one of the largest cranes in the UK for the bridge …

This is an opportunity for Technician members (EngTech MICE/FICE) and those wishing to become qualified at EngTech grade to come together to discuss issues that are important to technicians.