- Date
- 24 September 2026
- Time
- 13:30 - 15:00 BST (GMT+1)
- Location
-
MacKenzie site compound Bantaskin Street Glasgow, G20 0BE United Kingdom
Free
Book nowOverview
The 236-year-old Kelvin Aqueduct carries the Forth and Cycle Canal over the River Kelvin and at the time, was Britain’s largest aqueduct.
The structure's ongoing maintenance includes the dewatering of the basin and repairs to the base of the trough.
This site visit, with Scottish Canals and MacKenzie Construction, will give attendees the opportunity to explore and learn about a feat of canal engineering.
The event will consist of an overview of the project, followed by guided tours of the works to the trough and arches. Attendees will have the opportunity to enter the trough, the first time this has been possible in living memory.
Attendees are required to bring their own personal protective equipment (PPE): hardhat, gloves, high-vis vest, and steel toe cap boots. Lifejackets will be provided.
Attendees should arrive ahead of time to begin at 13:30 promptly.
Venue
Sustainable Development Goals:
More like this

- Type
- Lecture
Infrastructure design impacts of the second-generation Eurocodes
Join this discussion on the principal impacts of the second generation of Eurocodes on the design of concrete and steel bridge structures.

- Type
- Webinar
5-week course: sustainability
This course is designed to give developing professionals a strong foundation in sustainable engineering, equipping them with the knowledge and practical skills to effectively integrate sustainability into their work.

- Type
- Webinar
The Haverfordwest Signature Footbridge and Western Quayside regeneration project
A presentation from the architect, structural designers, fabricators and the principal contractor that delivered this unique structure. The discussion details how the bridge developed from concept design through to installation including the use of one of the largest cranes in the UK for the bridge …